Newport Shores Cluster Association
RESTON, VIRGINIA  20194              Email
  • HOME
  • HOMEOWNER RESOURCES
    • Directors & Officers
    • NSCA Membership Directory
    • Financial Reports
    • NSCA Meeting Minutes
    • Neighborhood News
    • Cluster Dues
    • Maps
    • Filing a Complaint
    • RECOMMENDED VENDORS
    • 2016 Cluster Picnic Slideshow
    • 2017 Cluster Picnic Slideshow
    • 2018 NSCA Picnic Slideshow
    • 2019 NSCA Picnic Slideshow
    • 2022 NSCA Picnic Slideshow
    • 2023 NSCA Picnic Slideshow
  • SERVICES
    • Trash and Recycling
    • Trash and Recycling. HOLIDAY SCHEDULE
    • Grounds Maintenance
    • Snow Removal
    • Roads and Sidewalks
    • Cluster Dock
    • Fire Lanes
  • LEGAL
    • NSCA Bylaws >
      • All Articles
      • Article I: Offices
      • Article II: Membership
      • Article III: Meetings of Members
      • Article IV: Fiscal Year, Budget and Dues
      • Article V: Directors
      • Article VI: Officers
      • Article VII: Committees
      • Article VIII: Books and Records
      • Article IX: Seal
      • Article X: Additional Rights, Duties, And Powers
      • Article XI: General Housekeeping Provisions and Association Affairs including Short Term Lodging Restrictions
      • Article XII: Amendments
    • Articles of Incorporation
    • DPOR Registration
    • Insurance
  • DESIGN STANDARDS
    • RA - NSCA Cluster Standards
    • Making Exterior Changes to Your Property
    • Design Review Board (DRB) Alterations and Additions Application
    • Cluster Property Guidelines
    • Property Use and Maintenance
    • Introduction to Newport Shores Cluster
    • Newport Shores Builder Sales Brochures including Floorplans
    • RECOMMENDED VENDORS
    • Exterior Color Palette
    • Awnings
    • Doors - Main & Patio Entry
    • Garage Doors
    • Fencing
    • HVAC Units
    • Lights - Outdoor Wall
    • Lights - Outdoor Front Post
    • Mailboxes
    • Roof Shingles
    • Siding & Trim
    • Skylights and Sun Tunnels
    • Windows
    • Rear Deck w/Spiral Stairs
    • Lakefront Decks - Only on Lots 31, 28, 26, 24, 22, and 20
    • Lakefront Patios - Only on lots 30, 29, 25, and 21
    • Lakefront Gazebos - Only on lots 32, 27, 23, and 19
  • RESALE CERTIFICATE
  • OTHER LINKS

DRB ALTERATIONS AND ADDITIONS APPLICATION

The Reston Association Design Review Application can be downloaded by clicking on the link below.
Reston Association Design Review Application
What should be included in your Design Review Application? 

An application should include:

  • A detailed written description of the proposed exterior modification or addition
  • Scale drawings
  • A site plan showing size and location of project
  • Photographs of the existing condition
  • A brochure, detail sheet or catalog photo of materials
  • Estimated project completion date(s) (projects must be started within six (6) months of the date of approval and completed within eighteen (18) months of the date of approval)
  • The signatures of at least three different property owners adjacent to or within view of the applicant’s alteration or improvement. 
  • At least one of the signatures must be that of the Newport Shores Cluster Association President or Vice President.  Please note, the neighbors' acknowledgment is neither an approval nor disapproval of your application.
At the discretion of the DRB, applications that the DRB determines to have a wider impact on the community may be required to provide additional notice beyond the signatory requirements of this provision.

Where do you send your completed Design Review Application?
Bring in or mail to the Reston Association your application and any necessary details and related materials.

RA’s address is:

Reston Association
Covenants Administration
12001 Sunrise Valley Drive
Reston, VA 20191-3404

The application may also be faxed to (703) 435-6516 or emailed to your Covenants Advisor as an attachment.  
Please call (703) 435-6530 to speak with your advisor and obtain their email address.  
​
Your Reston Association Covenants Advisor will contact you if additional information is needed. Reston Association Staff and/or members of the DRB may visit and possibly photograph your property for reference. The Reston Deed grants the Reston Association ingress and egress over the exterior grounds of your property/lot, if needed, in preparation for the review of your application.

Who is responsible for having your project reviewed and approved?
You are. The Association’s staff and the DRB are willing to work with you and your contractor. As well, your contractor may be able to share his/her knowledge of the design review process with you. However, you are ultimately responsible for ensuring that your property complies with the Design Covenants and Guidelines.


Picture
NEWPORT SHORES CLUSTER ASSOCIATION, P.O. BOX 3400, RESTON, VA  20195
Email: [email protected].